Satellite (Terminal Expansion) Munich Airport

Munich Airport Satellite Terminal, Germany - The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations and presents an enormous challenge to all those involved in the project.
Munich Airport Satellite Terminal, Germany - More than 4,500 MULTIPROP slab props carry the steel construction until, together with the hardened concrete, it is able to support independently. The up to 6.25 m extendable props only weigh 35 kg and can easily be moved by hand.
Munich Airport Satellite Terminal, Germany - The PERI solution for the huge construction site includes a comprehensive package of services: the supply of large quantities of materials, flexible engineering, tailored logistical operations as well as on-site support through the PERI project manager. The complete package provides all parties involved with real added value – for the contractor as well as the scaffolders.
Munich Airport Satellite Terminal, Germany - The PERI UP scaffolding construction reliably shields construction site activities from airport operations. At the same time, it serves as working scaffold for the facade contractors. Stair access and large-span bridging enhance the scaffold solution of the Weissenhorn experts.
Munich Airport Satellite Terminal, Germany - The extremely flexible PERI UP modular scaffolding can be optimally adapted to suit the loads to be transferred thanks to its consistent 25 cm grid dimensions. The combination with other rentable system components from the comprehensive PERI product range ensures very cost-effective fulfillment of all requirements.

Datos de Proyecto

Ubicación: Munich, Alemania

new construction of a satellite terminal during daily airport operations

steel composite construction: 600 m long and up to 80 m wide

Requerimientos

  • creation of a demarcation bewteen the jobsite and airfield with a scaffold construction which also serves as a
  • working scaffold
  • 7 m wide bridging to provide protection for the baggage transport operations  taking place directly underneath
  • scaffold anchorage on the steel construction with 6 m spacings
  • shoring concept for assembling the steel construction
  • maintaining strict safety requirements
  • unrestricted airport operations

Cliente

Shell Contractor
Hochtief Solutions AG, Shell Construction/Industrial Construction Branch Office, Hannover, Germany

Scaffold Contractor
Gloser GmbH, Walzbachtal, Germany

Field service
PERI Munich and PERI Weissenhorn, Germany

Beneficios para el cliente

  • solution with detailed planning, required static verifications and technical safety solutions
  • universally-applicable systems, simple handling, fast assembly, maximum level of working safety
  • prevention of disruptive effects between the contractors thanks to the planning, static, supply of materials and
  • service from one source
Statement Heiko Kornatz, Senior Foreman Shell Construction
Heiko Kornatz
Senior Foreman Shell Construction

We decided in favour of PERI as we are provided with a fully service and receive a solution for all our requirements. In particular, the PERI UP scaffolding can not only be used universally and is quick to assemble, but it is absolutely safe during use. Furthermore, the PERI project manager is a competent contact partner for all our construction needs.

Munich Airport Satellite Terminal, Germany - Richard Wurster, Site Manager Scaffold Assembly
Richard Wurster
Site Manager Scaffold Assembly

For fulfilling the strict planning and static requirements, we were supported by PERI with comprehensive engineering services. The simple handling ensures fast scaffold assembly, especially the protection against lifting and gap-free decking surfaces are a great advantage.

Solución PERI

  • comprehensive solution consisting of planning, materials and static verifications for meeting strict planning and static requirements
  • optimized scaffolding concept by combining different system components taken from the PERI product range
  • easy to handle props for temporary load transfer of the steel construction
  • continuous project supervision with logistical, technical and commercial services