Waldschlösschenbrücke, Dresden, Germany - Two steel arches, each with a span of 148 m, carry the middle section of the Waldschloesschen Bridge 26 m above the Elbe.
Waldschlösschenbrücke, Dresden, Germany - The carriageway slab of the steel composite bridge was constructed in 21 concreting sections. The raised formwork units used were based on rentable system components taken from the VARIOKIT engineering construction kit.
Waldschlösschenbrücke, Dresden, Germany - The raised formwork units were comprised of rentable VARIOKIT system components on which GT 24 lattice girders provided support for the formlining.
Waldschlösschenbrücke, Dresden, Germany - The project-specific solution with lightweight raised formwork units facilitated fast and simple moving to the next concreting section with the crane.
Waldschlösschenbrücke, Dresden, Germany - The Waldschloesschen Bridge connects the eastern and southern districts of the city with areas in the north of Dresden.
Waldschlösschenbrücke, Dresden, Germany - Between the two steel arches a 14 m wide carriageway was constructed consisting of four lanes, on both sides of the bridge 4.45 m wide pedestrian and cycle lanes cantilever outwards.

Datos de Proyecto

Ubicación: Dresden, Alemania

  • arched bridge over the river Elbe
  • structure: arched bridge with four lanes, plus pedestrian and cycle paths
  • superstructure in steel composite construction method
  • overall length: 635 m
  • standard cross-section width: 28 m
  • span of steel arches: 148 m
  • construction period: 2007 – 2012

Requerimientos

  • complicated bridge geometry

Cliente

ARGE Ingenieurbau Waldschlösschenbrücke;
Sächsische Bau GmbH, Dresden and EUROVIA Beton GmbH, Oebisfelde

Beneficios para el cliente

  • cost-effective solution with system components
  • fast construction progress without structural alteration works
  • only two different standard formwork units despite the geometrical changes of the superstructure 
Michael Wothe, Project Manager Waldschlösschenbrücke
Michael Wothe
Project leader

PERI offered us the most coherent approach for the superstructure formwork, tailor-made for the given bridge geometry. The formwork suggestions were already very detailed during the tender stage. Taking into consideration the local conditions, the VARIOKIT substructure meant the best option for us. This could be smoothly adjusted to any local circumstances.

Solución PERI

  • formwork unit construction for the superstructure with carriageway slab and cantilevers, based on the  VARIOKIT engineering modular kit