Msheireb Metro Station
Qatar,
Qatar
Subway station in the heart of Doha as lynchpin of the currently under construction state-of-the-art metro system in the capital of Qatar.
Major interchange featuring a toal of four main levels at depths of up to 40 m.
SOQ Joint Venture; Samsung C&T, OHL, QBC
Ubicación
El proyecto
Impresiones del proceso del proyecto.
The Msheireb subway station in the heart of Doha has been designed as a major interchange, and features almost 200 m long and 180 m wide imposing structural dimensions.
The project-specific formwork and shoring concept developed by PERI engineers, just-in-time provision of corresponding system equipment as well as continuous on-site support has facilitated cost-effective execution of construction within the tight schedule.
The complex structural geometry as well as massive reinforced concrete components with up to 3 m thick slabs and wall thicknesses up to 2 m required a customized system concept.
Within a very short space of time, PERI Qatar delivered 10,000 m² of wall and column formwork along with 150,000 m³ shoring to the construction site.
During the single-sided forming of the up to 9.50 m high walls with the VARIO Girder Wall Formwork, the fresh concrete pressure is reliably transferred to the sub-structure by means of SB Brace Frames.
The Msheireb subway station in the heart of Doha has been designed as a major interchange, and features almost 200 m long and 180 m wide imposing structural dimensions.
The project-specific formwork and shoring concept developed by PERI engineers, just-in-time provision of corresponding system equipment as well as continuous on-site support has facilitated cost-effective execution of construction within the tight schedule.
The complex structural geometry as well as massive reinforced concrete components with up to 3 m thick slabs and wall thicknesses up to 2 m required a customized system concept.
Within a very short space of time, PERI Qatar delivered 10,000 m² of wall and column formwork along with 150,000 m³ shoring to the construction site.
During the single-sided forming of the up to 9.50 m high walls with the VARIO Girder Wall Formwork, the fresh concrete pressure is reliably transferred to the sub-structure by means of SB Brace Frames.
Información del Proyecto
Carlos Allepuz
Construction Manager
PERI engineers have given us full round-the-clock technical support and reliable after sales service from day one. This close cooperation has enabled SOQ JV to use PERI cutting-edge solutions to build this very important station efficiently, safely and successfully.