Sports arena Lora

Datos de Proyecto

Ubicación: Split, Croacia

Multi-purpose hall with octagonal layout, 120 m x 80 m, and 12,500 seats

Finished: 2009 for the handball world championship in Croatia

Requerimientos

  • erecting scaffolding for 8 steel lattice girders
  • 180 tons of load per pair of trusses

Cliente

Dinarik d.o.o., Donji Prolozac

Beneficios para el cliente

  • cost-effective roof assembly
  • safe and fast erecting work
  • economic solution with system parts
Oliver Pezer
Work preparation and logistics

We chose PERI because of the professional formwork planning and support. All technical requirements were met in a cost-effective way with the PERI systems.

Solución PERI

  • PERI UP as shoring and erecting platform
  • brace frames used in suspended position as 7 m protruding support structure