Puente de La Pepa
Bahia de Cádiz,
España
- construction: cable-stayed bridge
- total length: 3.2 km
- span of main bay: 540 m
- two pylons at a height of 190 m
- six-lane road at a height of 69 m
UTE Puente de Cádiz:
Dragados S.A., Madrid; F.P.S. S.A., Madrid
Ubicación
El proyecto
Impresiones del proceso del proyecto.
Almost half of the 3.2 km long bridge construction crosses the Bay of Cadiz, with a 540 m span and 69 m vertical clearance between the two pylons.
The VARIO GT 24 wall formwork was climbed on ACS R self-climbing brackets. Working platforms and access technology were likewise realized using standard systems.
With the PERI steel construction, the high concreting loads from the 47 m wide pylon expansion could be safely transferred into the base.
The entire bridge project with all pylons, piers and superstructure featured a very wide range of construction phases.
Almost half of the 3.2 km long bridge construction crosses the Bay of Cadiz, with a 540 m span and 69 m vertical clearance between the two pylons.
The VARIO GT 24 wall formwork was climbed on ACS R self-climbing brackets. Working platforms and access technology were likewise realized using standard systems.
With the PERI steel construction, the high concreting loads from the 47 m wide pylon expansion could be safely transferred into the base.
The entire bridge project with all pylons, piers and superstructure featured a very wide range of construction phases.
Información del Proyecto
Victor M. Jiménez Aguadero
Construction Manager
We were able to define a formwork concept for this bridge project together with the PERI engineers which is based on the experience from numerous projects that have been carried out so far.